+ More options
DRI Logo

Search

Search Results

This report describes the results of the archaeological investigation of a wetland site at Ballynaclogh townland, Cappataggle, Co. Galway, on behalf of N6 Construction Ltd, during construction of the M6 Ballinasloe–Galway motorway scheme (Illus. 1 and 2). The site was discovered

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3874 Ballynaclogh,  County Galway.cover

This report presents the results of an archaeological excavation undertaken at Gortnagunned 2, Co. Galway on behalf of Galway County Council. The works were undertaken as part of the Archaeological Services Contract prior to the commencement of construction works as

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  12E0322 Gortnagunned, County Galway.cover

This is the final report for an archaeological excavation of Ardloy 1, which was located within the footprint of the N4 Ardloy Road Improvement Scheme. Ardloy 1 was discovered during advance [Stage (i) and (ii)] archaeological testing carried out by Fintan Walsh of Irish Archaeol

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report, 11E380 Ardloy 1, County Longford.cover

This report contains the final results of an archaeological excavation carried out as part of the N8 Cashel Bypass & N74 Link Road. Site 19 (chainage 6150–6260) was located on the south facing slope of a low hill immediately to the west of the Boscabell moated site (TI061- 027).

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  03E0426 Boscabell Site 19,  County Tipperary.cover

This report contains the final results of an archaeological excavation carried out as part of the N8 Cashel Bypass & N74 Link Road (03E0424). Pre-construction testing undertaken in 2002 by Mary Henry Archaeological Services Ltd identified an area of archaeological activity in Win

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  03E0424 Windmill Site 35,  County Tipperary.cover

This is the final report for an archaeological excavation of Kilgowan 5, which was located within the footprint of the M9 Kilcullen Motorway Service Area. Kilgowan 5 was discovered during advance archaeological testing carried out by James Kyle of Irish Archaeological Consultancy

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report, E4390 Kilgowan 5., County Kildare.cover

This is the final report for an archaeological excavation of Kilgowan 4, which was located within the footprint of the M9 Kilcullen Motorway Service Area. Kilgowan 4 was discovered during advance archaeological testing carried out by James Kyle of Irish Archaeological Consultancy

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report, E4389 Kilgowan 4., County Kildare.cover

This report contains the results of an archaeological excavation carried out as part of the N8 Cashel Bypass and N74 Link Road Scheme in 2003. Site 29 (chainage 4240 - 4280) was situated in the townland of Cooper’s-Lot, less than 1.7 km from Cashel. During Phase 1 trial testing c

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  03E0287 Wallers Lot Site 29,  County Tipperary.cover