+ More options
DRI Logo

Search

Search Results

This report details the licensed archaeological excavation of features uncovered during Phase 1 test trenching of the N7 Nenagh to Limerick High Quality Dual Carriageway. Phase 1 test trenching was carried out between January and March 2006 by ÆGIS ARCHAEOLOGY Ltd and Judith Carr

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2935 Ballintotty Site 2,  County Tipperary.cover

This report details the licensed archaeological excavation of features uncovered during Phase 3 test trenching of the N7 Nenagh to Limerick High Quality Dual Carriageway. Phase 3 test trenching was carried out in February 2007 by TVAS (Ireland) Ltd under Ministerial Direction Num

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3574 Ballyard Site 1,  County Tipperary.cover