+ More options
DRI Logo

Search

Search Results

The N81 Knockroe Bend Realignment Scheme is an upgrade of the N81 National Secondary Road between Hollywood and Baltinglass, Co. Wicklow. The scheme is located in Rathattin, Dragoonhill and Knockroe townlands, at a location known locally as Deering's Bend. The scheme is 0.8 km lo

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  17E0645 Dragoonhill,  County Wicklow.cover

This report contains the final results of an archaeological excavation carried out as part of the N8 Cashel Bypass & N74 Link Road (03E0675) in Windmill townland. Archaeological testing was carried out in May 2003 by Judith Carroll Network Archaeology (JCNA) Ltd under excavation

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  03E0675 Windmill Site 36i,  County Tipperary.cover

This report contains the final results of an archaeological excavation carried out as part of the N8 Cashel Bypass & N74 Link Road (03E0427). Site 16 (NGR 209670 / 141548, road chainage 6380–6460) measured 80 m long north/south and 70 m wide east/west. It was situated in the town

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  03E0427 Boscabell Site 16,  County Tipperary.cover

This report contains the final results of an archaeological excavation carried out as part of the N8 Cashel Bypass & N74 Link Road (03E0379). Site 8 (chainage 6750—6800) was situated in the townland of Monadreela, at the base of the south-east facing slope of Ballyknock Hill, a p

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  03E0379 Monadreela Site 8,  County Tipperary.cover