+ More options
DRI Logo

Search

Search Results

The N22 Ballincollig Bypass scheme involves the construction of a new dual carriageway between Bishopstown (Ballinaspig More townland) and Ovens (Knockanemore townland) and covers an area of 750,000 square metres. A programme of advance archaeological investigation was undertaken

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  02E0890 Carrigrohane 4,  County Cork.cover

This site was originally identified during archaeological monitoring of topsoil stripping in advance of the construction of the N8 Glanmire – Watergrasshill Road Scheme. The site was initially identified as a group of four distinct features of archaeol

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  01E0494 Killydonoghoe AR2,  County Cork.cover

The N22 Ballincollig Bypass scheme involves the construction of a new dual carriageway between Bishopstown (Ballinaspig More townland) and Ovens (Knockanemore townland) and covers an area of 750,000 square metres. A programme of advance archaeological investigation was undertaken

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  02E0383 Barnagore 2,  County Cork.cover