+ More options
DRI Logo

Search

Search Results

This report documents the final results of the archaeological excavation of Early Neolithic and Middle to Late Bronze Age domestic activity, early medieval pits and post-medieval field boundaries (E2482) on the route of the N7 Nenagh to Limerick High Quality Dual Carriageway (HQD

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2482 Ballyhisky Site 2,  County Tipperary.has no cover

Irish Archaeological Consultancy Ltd (IAC), funded by Galway County Council and the National Roads Authority (NRA), undertook the excavation of a group of burnt mounds under Ministerial Directions at the site of Caheraphuca 3–12 along the proposed N18 Gort to Crusheen road scheme

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3653 Caheraphuca 3-12,  County Clare.has no cover

This report documents the final results of the archaeological excavation of Middle to Late Bronze Age burnt stone spreads and pits and early medieval to medieval burnt stone spreads (site E2480) on the route of the N7 Nenagh to Limerick High Quality Dual Carriageway (HQDC), Clogh

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2480 Cloghleigh Site 1,  County Tipperary.has no cover

This report documents the final results of an archaeological excavation of an Iron Age pit, post- medieval ditches, inhumation burial, lime kiln and house (E2083) on the route of the Limerick Southern Ring Road Phase II, Cratloemoyle, Co. Clare (NGR 151152E 159479N to

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2083 Cratloemoyle Site 1,  County Clare.has no cover

The archaeological remains encountered at Kilbegly 1 were a medieval cereal-drying kiln, several shallow burnt pits, a curvilinear feature of unknown purpose and period and a post–medieval field boundary. Of these features only the kiln has any intrinsic significance as

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report, E3329 Kilbegly 1, County Roscommon.has no cover

This report presents the results of archaeological investigations carried out on behalf of Limerick County Council as part of the N7 Nenagh to Limerick Archaeological Resolution Contract. Phase 1 test trenching of the route was carried out by Judith Carroll and Company Ltd and Ae

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2311 Richhill Site 2,  County Limerick.has no cover

This report documents the final results of the archaeological excavation of an Early Bronze Age spread of burnt stone associated with a trough and other pits (site E2902) on the route of the N7Nenagh to Limerick High Quality Dual Carriageway (HQDC), Ballinteenoe Site 1, Co. Tippe

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2902 Ballinteenoe Site 1,  County Tipperary.has no cover

This report presents the results of archaeological investigations carried out on behalf of Limerick County Council as part of the N7 Nenagh ‐ Limerick Archaeological Resolution Contract. Phase 1 test trenching of the route was carried out by Judith Carroll and Company Ltd and Aeg

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2310 Ballyard Site 3,  County Tipperary.has no cover

This report documents the final results of the archaeological excavation of three isolated pits and a patch of in situ burning (dated to the Iron Age and early medieval periods), in addition to the excavation of test trenches (Site E2481) on the route of the N7 Nenagh to Limerick

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2481 Ballyhisky Site 1,  County Tipperary.has no cover

This report presents the results of archaeological investigations carried out on behalf of Limerick County Council as part of the N7 Nenagh to Limerick Archaeological Resolution Contract. Phase 1 test trenching of the route was carried out by Judith Carroll and Company Ltd and Ae

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2487 Gortybrigane Site 1,  County Tipperary.has no cover

The N17/18 Gort to Tuam PPP Scheme is approximately 57 km in length and will connect the N18 Gort to Crusheen Scheme (currently under construction) to the existing N17 road immediately north of Tuam. This overall scheme forms part of the Atlantic Corridor. The Atlantic Corridor i

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E4089 Mahanagh 3,  County Galway.has no cover