+ More options
DRI Logo

Search

Search Results

This report details the licensed archaeological excavation of features uncovered during Phase 1 test trenching of the N7 Nenagh to Limerick High Quality Dual Carriageway. Phase 1 test trenching was carried out between January and March 2006 by ÆGIS ARCHAEOLOGY Ltd and Judith Carr

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2484 Rossfinch Site 2,  County Tipperary.has no cover

Site D at Morett was excavated as part of the resolution of archaeological sites on the route of the N7 Heath-Mayfield Motorway Scheme. The site was identified during centreline test trenching as a significant concentration of archaeological features in fields immediately north-w

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report, 03E0461 Site D Morett, County Laois.has no cover

This report details the licensed archaeological excavation of features uncovered during Phase 1 test trenching of the N7 Nenagh to Limerick High Quality Dual Carriageway. Phase 1 test trenching was carried out between July and March 2006 by ÆGIS ARCHAEOLOGY Ltd and Judith Carroll

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2400 Ballynahinch Site 2,  County Tipperary.has no cover

This report presents the results of archaeological investigations carried out on behalf of Limerick County Council as part of the N7 Nenagh to Limerick Archaeological Resolution Contract. Phase 1test trenching of the route was carried out by Judith Carroll and Company Ltd and Aeg

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3266 Kilnacranna Site 1,  County Tipperary.has no cover

This report details the licensed archaeological excavation of features uncovered during Phase 3 test trenching of the N7 Nenagh to Limerick High Quality Dual Carriageway. Phase 3 test trenching was carried out in February 2007 by TVAS (Ireland) Ltd under Ministerial Direction Num

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3534 Killalane Site 1,  County Tipperary.has no cover

The excavation of the site at Gortore 1b E2410 comprised three areas, 1, 2 and 3. The site was located on the southern bank of the River Funshion. A truncated house and a group of pits and post-holes were excavated in Area 1. A group of pits, some dating to the Mesolithic period,

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2410 Gortore 1b,  County Cork.has no cover

Archaeological Development Services Ltd, having been commissioned by Louth County Council, the Roads Service NI (Department for Regional Development) and the National Roads Authority carried out archaeological assessment along the route of the proposed A1/N1 Newry-Dundalk Road. T

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report, E3805 Proleek Area 13 Site 121, County Louth.has no cover

This report comprises the final results of the archaeological excavation of Site 1, Ballinclay townland, Co. Wexford. Work was undertaken as part of the archaeological mitigation programme for the proposed N11 Gorey to Arklow Link Road Scheme. Excavation was conducted under Minis

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3466 Ballinclay Site 1,  County Wexford.has no cover

This report details the licensed archaeological excavation of features uncovered during Phase 1 test trenching of the N7 Nenagh to Limerick High Quality Dual Carriageway. Phase 1 test trenching was carried out between January and March 2006 by ÆGIS ARCHAEOLOGY Ltd and Judith Carr

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2935 Ballintotty Site 2,  County Tipperary.has no cover

Valerie J Keeley Ltd was commissioned by Laois County Council and the National Roads Authority to undertake archaeological works along 18.1km (Contract 2) of the 35km long N7 Castletown to Nenagh (Derrinsallagh to Ballintotty) Road Improvement Scheme (EIS approved in Novembe

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3744 Camlin/Derrymore 1,  County Tipperary.has no cover

This is the final report on the archaeological excavations at AR016, a Record of Monuments and Places (RMP) listed ringfort KE039-027 within the townland of Mullaghmarky, Castleisland, Co. Kerry. This work, conducted under conditions specified within Archaeological Works Contract

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  07E0474 Mullaghmarky Site AR016,  County Kerry.has no cover

Three separate cuttings were excavated at Derrybane 1. Area 1 measured 20 m by 20 m, Area 2 measured 92 m by 30 m and Area 3 measured 13 m by 15 m. Three large pits were excavated in Area 1. Area 2 was characterised by 22 small and shallow pits, located for the most part in the c

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3585 Derrybane 1, County Tipperary.has no cover