+ More options
DRI Logo

Search

Search Results

This report documents the final results of the archaeological excavation of two Bronze Age (Early and Late) fulachtaí fia and a Middle Bronze Age pit (site E3326) on the route of the N7 Nenagh to Limerick High Quality Dual Carriageway (HQDC), Annaholty Site 1, Co. Tipperary (NGR

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3326 Annaholty Site 1,  County Tipperary.cover

This report presents the results of archaeological investigations carried out on behalf of Limerick County Council as part of the N7 Nenagh ‐ Limerick Archaeological Resolution Contract (Figure 1). Phase 1 test trenching of the route was carried out by Judith Carroll and Company

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3403 Tullahedy Site 3,  County Tipperary.cover

This is a final report of an archaeological excavation at Cakestown Glebe 2 which was located on the route of the M3 Navan–Kells & Kells Bypass (Archaeological Services Contract 4) of the M3 Clonee–North of Kells Motorway Scheme, County Meath (Figure 1). The excavation was

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3158 Cakestown Glebe 2,  County Meath.cover