+ More options
DRI Logo

Search

Search Results

This is a final report of an archaeological excavation at Sheephouse 2 (00E0810) which was located on the route of the M1 Northern Motorway Gormanston – Monasterboice (Drogheda Bypass), Platin to Oldbridge, Chainage 21600–24800, Contract 7, County Meath. The excavation was carrie

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report, 00E0810 Sheephouse 2 , County Meath.has no cover

The N17/18 Gort to Tuam PPP Scheme is approximately 57 km in length and will connect the N18 Gort to Crusheen Scheme to the existing N17 road immediately north of Tuam. This overall scheme forms part of the Atlantic Corridor. The Atlantic Corridor is designed to connect Letterken

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E4092 Annagh Hill 1,  County Galway.has no cover

Eachtra Archaeological Projects were commissioned by Laois County Council and the National Roads Authority to undertake archaeological works along 17.1 km (Contact 1) of the 35km N7 Castletown to Nenagh (Derrinsallagh to Ballintotty) national road scheme (EIS approved in November

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3661 Busherstown,  County Offaly.has no cover

This is a final report of an archaeological excavation at Sheephouse 1 (01E0907) which was located on the route of the M1 Northern Motorway Gormanston – Monasterboice (Drogheda Bypass), Platin to Oldbridge, Chainage 21600–24800, Contract 7, County Meath. The excavation was carrie

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report, 01E0907 Sheephouse 1, County Meath.has no cover