+ More options
DRI Logo

Search

Search Results

This report contains the final results of an archaeological excavations carried out as part of the N8 Cashel Bypass & N74 Link Road. The scheme involved an 8 km bypass of the town and a 2 km link road to the N74 (figure 1). South Tipperary County Council completed the bypass and

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  03E0756 Rathordan Site 25v,  County Tipperary.cover