+ More options
DRI Logo

Search

Search Results

This Stage (iv) Excavation Report details the results of the archaeological excavation at Knockbrack 1 (ITM 504696, 785521), carried out in advance of the construction of the proposed N5 Westport to Turlough Road Project, which extends between the townlands of Westport Demesne an

N5 Westport to Turlough Road Project | archaeology | dating (measuring)

Object type is text   Text
Object Archaeological excavation report,  E004732 Knockbrack 1,  County Mayo.cover

This Stage (iv) Excavation Report details the results of the archaeological excavation at Deerpark East 4 (ITM 499320, 785539), carried out in advance of the proposed N5 Westport to Turlough Road Project, which extends between the townlands of Westport Demesne and Liscromwell in

N5 Westport to Turlough Road Project | archaeology | dating (measuring)

Object type is text   Text
Object Archaeological excavation report,  E004709 Deerpark East 4,  County Mayo.cover

This Stage (iv) Excavation Report details the results of the archaeological excavation at Claggarnagh West 2 (ITM 508037, 786282) in advance of the construction of the proposed N5 Westport to Turlough Road Project, which extends between the townlands of Westport Demesne and Liscr

N5 Westport to Turlough Road Project | archaeology | dating (measuring)

Object type is text   Text
Object Archaeological excavation report,  E004697 Claggarnagh West 2,  County Mayo.cover

This Stage (iv) Excavation Report details the results of the archaeological excavation at Claggarnagh West 1 (ITM 508083, 786296) in advance of the construction of the proposed N5 Westport to Turlough Road Project, which extends from the townland of Westport Demesne to Liscromwel

N5 Westport to Turlough Road Project | archaeology | dating (measuring)

Object type is text   Text
Object Archaeological excavation report,  E004696 Claggarnagh West 1,  County Mayo.cover

The proposed N8 Rathcormac Fermoy By-Pass is approximately 17.5km in length and will extend from the northern end of the new N8 Glanmire-Watergrasshill Bypass in the townland of Meenane, passing to the west of Rathcormac and to the east of Fermoy and onto the northe

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  03E1461 Lisnagar Demesne 2,  County Cork.cover

The proposed N8 Rathcormac Fermoy By-Pass is approximately 17.5km in length and will extend from the northern end of the new N8 Glanmire-Watergrasshill Bypass in the townland of Meenane, passing to the west of Rathcormac and to the east of Fermoy and onto the northe

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  03E1465 Fermoy 1,  County Cork.cover

The proposed M7 Portlaoise to Castletown/M8 Portlaoise to Cullahill Motorway Scheme consists of approximately 41km of motorway and 11km of single dual carriageway commencing to the southwest of the existing Portlaoise Bypass and running in a southern direction tying into the exis

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2157 Clonboyne 2,  County Laois.cover

This report details the results of the archaeological excavation of Ballytrust 1 in advance of the proposed N55 Realignment Scheme, Co. Cavan (Figures 1-2). The site was identified during archaeological testing Stage (i) of the proposed N55 Realignment Scheme, Co. Cavan and was c

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  16E0527 Ballytrust 1,  County Cavan.cover

This report details the results of the archaeological excavation at Garrymore 3 in advance of the proposed N55 Realignment Scheme, Co. Cavan (Figures 1-2). The site was identified during Stage (i) archaeological testing of the proposed N55 Road Realignment Scheme, Co. Cavan, by J

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  16E0502 Garrymore 3,  County Cavan.cover

The proposed M7 Portlaoise to Castletown/M8 Portlaoise to Cullahill Motorway Scheme consists of approximately 41km of motorway and 11km of single dual carriageway commencing to the southwest of the existing Portlaoise Bypass and running in a southern direction tying into the exis

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2131 Leap 2,  County Laois.cover

This report details the results of the archaeological excavation at Garrymore 2 in advance of the proposed N55 Realignment Scheme, Co. Cavan (Figures 1-2, Plates 1-4). The site was identified during archaeological testing Stage (i) of the proposed N55 Realignment Scheme, Co. Cava

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  16E0521 Garrymore 2,  County Cavan.cover

Archaeological test trenching was carried out in advance of construction along the route of the proposed M4 Kinnegad-Enfield-Kilcock Motorway Scheme. In February 2002 during centreline testing of the Donadea road re-alignment carried out by Donald Murphy under licence 02E102 of

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  02E1075 Kilmorebrannagh, County Kildare.cover