+ More options
DRI Logo

Search

Search Results

This final archaeological report describes the results of the excavation carried out at the site of Kilbeg 8 in the townland of Kilbeg, Co. Westmeath (Figures 1–3) as part of an archaeological mitigation program associated with the N6 Phase 2: Kilbeggan to Athlone Dual Carriagewa

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3966 Kilbeg 8,  County Westmeath.has no cover

This final archaeological report describes the results of the excavation carried out at the site of Aghafin 1 in the townland of Aghafin, Co. Westmeath (Figures 1 and 2) as part of an archaeological mitigation program associated with the N6 Phase 2: Kilbeggan to Athlone Dual Carr

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2665 Aghafin 1,  County Westmeath.has no cover

This final archaeological report describes the results of the excavation carried out at the site of Ballinderry Big 3 in the townland of Ballinderry Big, Co. Westmeath (Figures 1 and 2) as part of an archaeological mitigation program associated with the N6 Phase 2: Kilbeggan to A

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3277 Ballinderry Big 3,  County Westmeath.has no cover

Archaeological test trenching was carried out in advance of construction along the route of the proposed M4 Kinnegad-Enfield-Kilcock Motorway Scheme. In February 2002 during centreline testing of the motorway carried out by Eoin Corcoran under licence 02E0105 of Duchas The Herita

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  02E1142 Griffinstown 1, County Westmeath.has no cover