+ More options
DRI Logo

Search

Search Results

The proposed N8 Rathcormac Fermoy By-Pass is approximately 17.5km in length and will extend from the northern end of the new N8 Glanmire-Watergrasshill Bypass in the townland of Meenane, passing to the west of Rathcormac and to the east of Fermoy and onto the northern tie- in poi

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  03E1094 Mondaniel 3,  County Cork.cover

The proposed N8 Rathcormac Fermoy By-Pass is approximately 17.5km in length and will extend from the northern end of the new N8 Glanmire-Watergrasshill Bypass in the townland of Meenane, passing to the west of Rathcormac and to the east of Fermoy and onto the northe

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  03E0912 Corrin 1,  County Cork.cover

The N22 Ballincollig Bypass scheme involves the construction of a new dual carriageway between Bishopstown (Ballinaspig More townland) and Ovens (Knockanemore townland) and covers an area of 750,000 square metres. A programme of advance archaeological investigation was undertaken

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  01E1209 Curraheen 1,  County Cork.cover