+ More options
DRI Logo

Search

Search Results

This report presents the results of archaeological investigations carried out on behalf of Limerick County Council as part of the N7 Nenagh to Limerick Archaeological Resolution Contract. Phase 1 test trenching of the route was carried out by Judith Carroll and Company Ltd and Ae

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2487 Gortybrigane Site 1,  County Tipperary.cover

Archaeological monitoring of topsoil stripping, in advance of the construction of the N7 Nenagh Bypass, resulted in the discovery of a number of previously unknown archaeological sites in the townland of Tullahedy. This report details the excavation of seven of those sites (Areas

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  98E0540 Tullahedy Areas A-G ,  County Tipperary.cover