The archaeological works associated with the N8 Fermoy to Mitchelstown Project (otherwise referred to as the M8 Fermoy Mitchelstown motorway) was carried out on behalf of Cork County Council, National Road Design Office, Richmond, Glanmire, Co. Cork. The project was funded by the

archaeology | specialist report | M8 Fermoy to Mitchelstown Motorway

Object type is text   Text
Object M8 Fermoy Mitchelstown motorway Revised  Lithics Reporthas no cover

Please note that while no preview image for the data sheets is available above the can still be downloaded. The archaeological works associated with the N8 Fermoy to Mitchelstown Project (otherwise referred to as the M8 Fermoy Mitchelstown motorway) was carried out on behalf

archaeology | specialist report | M8 Fermoy to Mitchelstown Motorway

Object type is text   Text
Object M8 Fermoy Mitchelstown motorway Revised Lithics Data Sheets by Dr Farina Sternkehas no cover

The excavation of the site at Gortore 1b E2410 comprised three areas, 1, 2 and 3. The site was located on the southern bank of the River Funshion. A truncated house and a group of pits and post-holes were excavated in Area 1. A group of pits, some dating to the Mesolithic period,

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2410 Gortore 1b,  County Cork.has no cover