+ More options
DRI Logo

Search

Search Results

This report details the results of the Archaeological Monitoring of the M4 Celbridge Interchange Scheme, Co. Kildare. Eighteen sites were found during monitoring of the 4km long scheme that ran through gently undulating land with a mixture of arable, pasture and woodland. All sit

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report, 01E0306 sites 1, 2, 3, 5, County Kildare.has no cover