+ More options
DRI Logo

Search

Search Results

This final report presents the results of archaeological investigations carried out on behalf of Kildare County Council and the National Roads Authority as part of Contract 4 ? Archaeological Services prior to the commencement of construction on the N9/N10 Kilcullen to Waterford

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2625  Prumpelstownn Lower 3,  County Kildare.has no cover

Eighteen sites were found during archaeological monitoring of the M4 Celbridge Interchange Scheme. The scheme was approximately 4km in length and ran through gently undulating land with a mixture of arable, pasture and woodland. Known Recorded Monuments in the immediate area incl

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report, 01E1225 site 18 Collinstown, County Kildare.has no cover

This report details the findings of the excavation of Site 14 on the M4 Celbridge Interchange Scheme Co. Kildare. Eighteen sites were found during monitoring of the 4km long scheme that ran through gently undulating land with a mixture of arable, pasture and woodland. Known Re

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report, 01E0999 site 14 Collinstown, County Kildare.has no cover

This report details the final results of an archaeological excavation at Site 7 in Kilmacredock Upper townland on the M4 Celbridge Interchange Scheme, Co. Kildare (NGR 297742.140 E 235338.650 N). The scheme was approximately 4km in length and a total of eighteen sites were found

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report, 01E0547 site 7 Kilmacredock Upper, County Kildare.has no cover