+ More options
DRI Logo

Search

Search Results

The N80 Maidenhead Realignment Scheme is an upgrade of the N80 National Secondary Road between Arless and Stradbally, Co. Laois. The scheme is located in Ballynagall, Maidenhead, Coolanowle, Farnans, and Castletown townlands. The scheme is 2.03 km long (9.54 hectare were acquired

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  18E0236 Maidenhead 1,  County Laois.has no cover

Site D at Morett was excavated as part of the resolution of archaeological sites on the route of the N7 Heath-Mayfield Motorway Scheme. The site was identified during centreline test trenching as a significant concentration of archaeological features in fields immediately north-w

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report, 03E0461 Site D Morett, County Laois.has no cover