+ More options
DRI Logo

Search

Search Results

As part of the Nenagh By-Pass Project, Tipperary (North Riding) County Council in association with the National Roads Authority are constructing a new road linking the existing N-52 at Moyroe to the existing N7 at Tullahedy, Co. Tipperary (Fig. 1-2 ). A programme of fieldwalking

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  00E0552 Site C1 Solsborough,  County Tipperary.cover

This report presents the results of archaeological investigations carried out on behalf of Limerick County Council as part of the N7 Nenagh to Limerick Archaeological Resolution Contract. Phase 1 test trenching of the route was carried out by Judith Carroll and Company Ltd and Ae

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2316 Cooleen Site 3,  County Tipperary.cover

This report details the licensed archaeological excavation of features uncovered during Phase 1 test trenching of the N7 Nenagh to Limerick High Quality Dual Carriageway. Phase 1 test trenching was carried out between January and March 2006 by ÆGIS ARCHAEOLOGY Ltd and Judith Carr

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2485 Rossfinch Site 1,  County Tipperary.cover

This report documents the final results of the archaeological excavation of an undated enclosure associated with early medieval features, an early medieval kiln and hearths, a late medieval pit and post-medieval ditches and furrows (site E2904) on the route of the N7 Nenagh to Li

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2904 Kilnacranna Site 2,  County Tipperary.cover

Valerie J Keeley Ltd was commissioned by Laois County Council and the National Roads Authority to undertake archaeological works along 18.1km (Contract 2) of the 35km long N7 Castletown to Nenagh (Derrinsallagh to Ballintotty) Road Improvement Scheme (EIS approved in November

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3900 Rathnaveoge Upper 1,  County Tipperary.cover

This report presents the results of archaeological investigations carried out on behalf of Limerick County Council as part of the N7 Nenagh to Limerick Archaeological Resolution Contract. Phase 1 test trenching of the route was carried out by Judith Carroll and Company Ltd and Ae

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2496 Cappadine Site 1,  County Tipperary.cover

Archaeological monitoring of topsoil stripping, in advance of the construction of the N7 Nenagh Bypass, resulted in the discovery of 4 sites (Sites A-D) in the townland of Lahesseragh. This report details the excavation of one of these sites, Site A. This site was subject to a fu

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  98E0473 Lahesseragh A,  County Tipperary.cover

Valerie J Keeley Ltd was commissioned by Laois County Council and the National Roads Authority to undertake archaeological works along 18.1km (Contract 2) of the 35km long N7 Castletown to Nenagh (Castleroan to Derrinsallagh) Road Improvement Scheme (EIS approved in Novem

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3903 Boola 1,  County Tipperary.cover

The site at Ballintotty (Knockaunkennedy), excavated prior to the construction of the N7 Nenagh Bypass, consisted of a classic burnt mound site and a nearby hearth feature. The mound produced possible evidence for the processing of animal products, but remains undated. The nearby

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E0472 Knockaunkennedy,  County Tipperary.cover

This report presents the results of archaeological investigations carried out on behalf of Limerick County Council as part of the N7 Nenagh to Limerick Archaeological Resolution Contract. Phase 1test trenching of the route was carried out by Judith Carroll and Company Ltd and Aeg

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2488 Gortybrigane Site 2,  County Tipperary.cover