+ More options
DRI Logo

Search

Search Results

This Stage (iv) excavation report details the results of the archaeological excavation of a field system and a cereal-drying kiln at Ballygillin 1 in advance of the construction of the proposed N52 Cloghan to Billistown Phase 2 ? Turin to Billistown Realignment, Co. Westmeath (Fi

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report, 18E0602 Ballygillin 1, County Westmeath.has no cover

This final archaeological report describes the final results of the excavation carried out at the site of Kilbeggan South 3 in the townland of Kilbeggan South, Co. Westmeath (Figures 1 and 2) as part of an archaeological mitigation programme associated with the N6 Phase 2: Kilbeg

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3283 Kilbeggan South 3,  County Westmeath.has no cover

This archaeological report describes the final results of the excavation carried out at the site of Tonaphort 3 in the townland of Tonaphort, Co. Westmeath (Figures 1 and 2) as part of an archaeological mitigation program associated with the N6 Phase 2: Kilbeggan to Athlone Dual

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3280 Tonaphort 3,  County Westmeath.has no cover

This report comprises the final results of the archaeological excavation of sites 2.1- 2.4, Hallsfarm Townland, Co. Westmeath. This excavation was undertaken as part of the archaeological programme for the N6 Kilbeggan to Kinnegad road scheme. It was conducted by Liam McKinstry,

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2750 Hallsfarm 2.1-4,  County Westmeath.has no cover