The N80 Maidenhead Realignment Scheme is an upgrade of the N80 National Secondary Road between Arless and Stradbally, Co. Laois. The scheme is located in Ballynagall, Maidenhead, Coolanowle, Farnans, and Castletown townlands. The scheme is 2.03 km long (9.54 hectare were acquired

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  18E0236 Maidenhead 1,  County Laois.has no cover

This report presents the results of archaeological investigations carried out on behalf of Limerick County Council as part of the N7 Nenagh to Limerick Archaeological Resolution Contract. Phase 1 test trenching of the route was carried out by Judith Carroll and Company Ltd and Ae

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2309 Touknockane Site 1,  County Tipperary.has no cover

The following report describes the results of an archaeological excavation of Toobrackan 1 and 2 (licence ref.: 10E0301), which was located along the route of N5 Ballaghaderreen Bypass, Co. Roscommon. Toobrackan 1 and 2 were discovered during a first phase of archaeolog

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report, E0301 Toobrackan 1 and 2, County Roscommon.has no cover

This report comprises the final results of the archaeological excavation of Site 24, in the townland of Raheenagurren West, Co. Wexford. Work was undertaken as part of the archaeological mitigation programme for the proposed N11 Gorey to Arklow Link Road Scheme. Excavation was co

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3488 Raheenagurren West Site 24,  County Wexford.has no cover