+ More options
DRI Logo

Search

Search Results

This final report presents the results of archaeological investigations carried out on behalf of Kildare County Council as part of Archaeological Services Contract No. 4 ? Resolution, Prumplestown to Powerstown, prior to the commencement of construction on this section of the N9/

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2610 Ballybannon 5,  County Carlow.has no cover

This is a final report of an archaeological excavation at Gardenrath 2 which was located on the route of the M3 Navan–Kells & Kells Bypass (Archaeological Services Contract 4) of the M3 Clonee–North of Kells Motorway Scheme, County Meath. The excavation was carried out by D

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3145 Gardenrath 2,  County Meath.has no cover

This is a final report of an archaeological excavation at Kilmainham 1B which was located on the route of the M3 Navan–Kells & Kells Bypass (Archaeological Services Contract 4) of the M3 Clonee–North of Kells Motorway Scheme, County Meath. The excavation was carried out by David

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3142 Kilmainham 1b Text,  County Meath.has no cover

This report contains the final results of an archaeological excavation carried out as part of the N8 Cashel Bypass & N74 Link Road. Site 19 (chainage 6150–6260) was located on the south facing slope of a low hill immediately to the west of the Boscabell moated site (TI061- 027).

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  03E0426 Boscabell Site 19,  County Tipperary.has no cover