+ More options
DRI Logo

Search

Search Results

This report documents the final results of the archaeological excavation of a multi-phase finds-rich site, dating from the Early Neolithic to post medieval or modern periods. The site contained evidencefor Neolithic domestic or ritual activity, Bronze Age domestic or industrial o

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3370 Cooleen Site 1,  County Tipperary.has no cover

The N17/18 Gort to Tuam PPP Scheme is approximately 57 km in length and will connect the N18 Gort to Crusheen Scheme to the existing N17 road immediately north of Tuam. This overall scheme forms part of the Atlantic Corridor designed to connect Letterkenny, County Donegal to Wate

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E4084 Kilskeagh 3,  County Galway.has no cover

The N17/18 Gort to Tuam PPP Scheme is approximately 57 km in length and will connect the N18 Gort to Crusheen Scheme to the existing N17 road immediately north of Tuam. This overall scheme forms part of the Atlantic Corridor designed to connect Letterkenny, County Donegal to Wate

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E4064 Cloondarone C,  County Galway.has no cover

Eachtra Archaeological Projects were commissioned by Laois County Council and the National Roads Authority to undertake archaeological works along 17.1 km (Contact 1) of the 35km N7 Castletown to Nenagh (Derrinsallagh to Ballintotty) national road scheme (EIS approved in November

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3659 Park 1,  County Tipperary.has no cover