+ More options
DRI Logo

Search

Search Results

This report presents the results of archaeological investigations carried out on behalf of Kildare County Council as part of Contract 4 ? Archaeological Services prior to the commencement of construction on the N9/N10 Kilcullen to Waterford Scheme: Kilcullen to Powerstown. The wo

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2603 Cloghristick 3,  County Carlow.cover

This final report presents the results of archaeological investigations carried out on behalf of Kildare County Council as part of Archaeological Services Contract No. 4 ? Resolution, Prumplestown to Powerstown, prior to the commencement of construction on this section of the N9/

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2588 Ballybar Upr 2,  County Carlow.cover

The N9/N10 Kilcullen to Waterford Road Scheme, of which the Kilcullen to Powerstown Scheme forms part, was proposed as a High Quality Dual Carriageway/Motorway, forming the Major Inter Urban route between Dublin and Waterford. The Kilcullen to Powerstown Scheme was advanced as a

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2581 Busherstown 4,  County Carlow.cover

This report documents the final results of an archaeological excavation of an Iron Age pit, post- medieval ditches, inhumation burial, lime kiln and house (E2083) on the route of the Limerick Southern Ring Road Phase II, Cratloemoyle, Co. Clare (NGR 151152E 159479N to

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2083 Cratloemoyle Site 1,  County Clare.cover