+ More options
DRI Logo

Search

Search Results

Irish Archaeological Consultancy Ltd (IAC), funded by the National Roads Authority (NRA) through Kilkenny County Council, undertook an excavation at the site of AR092, Kilree 2 along the proposed N9/N10 Kilcullen to Waterford Scheme, Phase 4 – Knocktopher to Powerstown (Figure 1)

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report, E3729 Kilree 2,   County Kilkenny.cover

Irish Archaeological Consultancy Ltd (IAC), funded by the National Roads Authority (NRA) through Kilkenny County Council, undertook an excavation at the site of AR081, Croan 1 along the proposed N9/N10 Kilcullen to Waterford Scheme, Phase 4 – Knocktopher to Powerstown (Figure 1).

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3543 Croan 1,  County Kilkenny.cover

This report comprises the final results of the archaeological excavation of Site 6, in the townland of Coolamurray, Co. Wexford. Work was undertaken as part of the archaeological programme for the N30 Moneytucker to Jamestown Re-Alignment Scheme. The excavation was conducted by D

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  04E0324 Coolamurry Site 6,  County Wexford.cover