+ More options
DRI Logo

Search

Search Results

This report provides a detailed stratigraphic analysis of the result of archaeological excavations at Site21, Raystown, County Meath as part of the N2 Finglas-Ashbourne Road Scheme. This work was undertaken by CRDS Ltd., on behalf of Meath County Council. This substant

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  03E1229 Raystown site 21 Vol 1 ,  County Meath.has no cover

The N9/N10 Kilcullen to Waterford Road Scheme, of which the Kilcullen to Powerstown Scheme forms part, was proposed as a High Quality Dual Carriageway/Motorway, forming the Major Inter Urban route between Dublin and Waterford. The Kilcullen to Powerstown Scheme was advanced as a

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2581 Busherstown 4,  County Carlow.has no cover

On behalf of Kildare County Council National Roads Design Office, archaeological monitoring of topsoil stripping was undertaken in advance of construction of the M7 Heath-Mayfield Motorway Scheme in County Kildare and County Laois by Jonathan Dempsey of Archaeological Consultancy

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  03E0623 26 Sites,  County Laois.has no cover

A total of seven phases were identified on site. The first was identified as a Neolithic metalled surface which may represent a working or walking surface. This had been partially cut by a foundation trench for a possible sub-circular shaped Neolithic structure. The infant burial

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report, 01E0039 Claristown 2, County Meath.has no cover