+ More options
DRI Logo

Search

Search Results

This report comprises the final results of the archaeological excavation of Site AR 33, in the townland of Borris, Co Tipperary North Riding. Work was undertaken as part of the archaeological mitigation programme for the proposed M8N8 Cullahill to Cashel Road Improvement Scheme.

M8/N8 Cullahill to Cashel Road Scheme | archaeology | dating (measuring)

Object type is text   Text
Object Archaeological excavation report,  E2376 Borris AR 33 Vol 1 and 2,  County Tipperary.has no cover

This Stage (iv) Excavation Report details the results of the archaeological excavation at Lisnageeha or Antigua 2 (ITM 515200, 788028) in advance of the construction of the proposed N5 Westport to Turlough Road Project, which extends between the townlands of Westport Demesne and

N5 Westport Turlough Road Scheme | archaeology | dating (measuring)

Object type is text   Text
Object Archaeological excavation report,  E004736 Lisnageeha or Antigua 2,  County Mayo.has no cover

This Stage (iv) excavation report details the results of the archaeological excavation of a field system and a cereal-drying kiln at Ballygillin 1 in advance of the construction of the proposed N52 Cloghan to Billistown Phase 2 ? Turin to Billistown Realignment, Co. Westmeath (Fi

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report, 18E0602 Ballygillin 1, County Westmeath.has no cover

Site D at Morett was excavated as part of the resolution of archaeological sites on the route of the N7 Heath-Mayfield Motorway Scheme. The site was identified during centreline test trenching as a significant concentration of archaeological features in fields immediately north-w

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report, 03E0461 Site D Morett, County Laois.has no cover

The N17/18 Gort to Tuam PPP Scheme is approximately 57 km in length and will connect the N18 Gort to Crusheen Scheme to the existing N17 road immediately north of Tuam. This overall scheme forms part of the Atlantic Corridor. The Atlantic Corridor is designed to connect Letterken

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E4092 Annagh Hill 1,  County Galway.has no cover

This report details the licensed archaeological excavation of features uncovered during Phase 1 test trenching of the N7 Nenagh to Limerick High Quality Dual Carriageway. Phase 1 test trenching was carried out between January and March 2006 by ÆGIS ARCHAEOLOGY Ltd and Judith Carr

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2935 Ballintotty Site 2,  County Tipperary.has no cover

This archaeological report describes the final results of the excavation carried out at the site of Tonaphort 3 in the townland of Tonaphort, Co. Westmeath (Figures 1 and 2) as part of an archaeological mitigation program associated with the N6 Phase 2: Kilbeggan to Athlone Dual

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3280 Tonaphort 3,  County Westmeath.has no cover

Eighteen sites were found during archaeological monitoring of the M4 Celbridge Interchange Scheme. The scheme was approximately 4km in length and ran through gently undulating land with a mixture of arable, pasture and woodland. Known Recorded Monuments in the immediate area incl

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report, 01E1225 site 18 Collinstown, County Kildare.has no cover