+ More options
DRI Logo

Search

Search Results

This report documents the final results of the archaeological excavation of multi-phase activity, dating from the Neolithic through to the post-medieval and later in ten areas at site E2479 on the route of theN7 Nenagh to Limerick High Quality Dual Carriageway (HQDC), Ballywillia

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2479 Ballywilliam Site 1,  County Tipperary.has no cover

The proposed M7 Portlaoise to Castletown/M8 Portlaoise to Cullahill Motorway Scheme consists of approximately 41km of motorway and 11km of single dual carriageway commencing to the southwest of the existing Portlaoise Bypass and running in a southern direction tying into the exis

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2170 Parknahown 5  Vol III Osteo Rpt,  County Laois.has no cover

The proposed M7 Portlaoise to Castletown/M8 Portlaoise to Cullahill Motorway Scheme consists of approximately 41km of motorway and 11km of single dual carriageway commencing to the southwest of the existing Portlaoise Bypass and running in a southern direction tying into the exis

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2170 Parknahown 5  Vol II  Append 1_17,  County Laois.has no cover

The proposed M7 Portlaoise to Castletown/M8 Portlaoise to Cullahill Motorway Scheme consists of approximately 41km of motorway and 11km of single dual carriageway commencing to the southwest of the existing Portlaoise Bypass and running in a southern direction tying into the exis

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2170 Parknahown 5  Vol IV  Images,  County Laois.has no cover

The proposed M7 Portlaoise to Castletown/M8 Portlaoise to Cullahill Motorway Scheme consists of approximately 41km of motorway and 11km of single dual carriageway commencing to the southwest of the existing Portlaoise Bypass and running in a southern direction tying into the exis

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2170 Parknahown 5 Vol I Text.,  County Laois.has no cover