+ More options
DRI Logo

Search

Search Results

This report describes the results of an archaeological excavation completed in advance of construction of the N25 Waterford City Bypass. Waterford City Council procured two archaeological services contracts in February 2002. The contracts covered the assessment of 274 hectares of

N25 Waterford Bypass | archaeology | dating (measuring)

Object type is text   Text
Object Archaeological excavation report, 04E0288 Newrath 36 and 37, County Waterford.has no cover

The following report describes the results of an archaeological excavation at Drumgold 7, Co. Wexford (ITM 699890, 638650) identified as a result of archaeological monitoring during the construction phase of the M11 Gorey to Enniscorthy PPP Scheme (Figures 1?2). The excavation wa

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report, E004788 Drumgold 7, County Wexford.has no cover

The following report describes the results of archaeological excavation undertaken at Dundavan 1, part of the N55 Dundavan to Mullaghoran Road Realignment Scheme, Co. Cavan (Figure 1). Archaeological testing was carried out by Derek Gallagher of IAC Ltd under excavation licence n

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  11E0385 Dundavan 1,  County Cavan.has no cover

This final report presents the results of archaeological investigations carried out on behalf of Kildare County Council and the National Roads Authority as part of Archaeological Services Contract No. 4 ? Resolution, Prumplestown to Powerstown, prior to the commencement of constr

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2589 Tinryland 1,  County Carlow.has no cover

This report presents the results of archaeological investigations carried out on behalf of Limerick County Council as part of the N7 Nenagh to Limerick Archaeological Resolution Contract. Phase 1 test trenching of the route was carried out by Judith Carroll and Company Ltd and Ae

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2487 Gortybrigane Site 1,  County Tipperary.has no cover

This site was located in the townland of Coolbeg, c. 4.7km southwest of Wicklow, Co. Wicklow. The archaeological excavation was carried out by Irish Archaeological Consultancy Ltd on behalf of Wicklow County Council and the National Roads Authority in advance of the construction

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3253 Coolbeg A022-067,  County Wicklow.has no cover

A single shallow pit/hearth was exposed. It measured 0.26m in diameter to a depth of 0.045m (37.295m O.D.) and contained gradually sloping sides to a partially concave-flat base. It had been filled with a mid brown clay containing moderate inclusions of charcoal and heat shattere

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report, 01E0185 Kilsharvan 10, County Meath.has no cover

Archaeological Development Services Ltd, having been commissioned by Louth County Council, the Roads Service NI (Department for Regional Development) and the National Roads Authority carried out archaeological assessment along the route of the proposed A1/N1 Newry-Dundalk Road. T

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report, E3789 Drumnacarra Area 10 Site 104, County Louth.has no cover

This report presents the Final results of archaeological excavations carried out at Manor East 1 in advance of the proposed N22 Tralee Bypass/ Tralee to Bealagrellagh road scheme in Co. Kerry. The proposed scheme has two main components, the N22 Tralee Bypass and the N22 Tralee t

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E4323 Manor East 1,  County Kerry.has no cover

This is a final report of an archaeological excavation at Cakestown Glebe 2 which was located on the route of the M3 Navan–Kells & Kells Bypass (Archaeological Services Contract 4) of the M3 Clonee–North of Kells Motorway Scheme, County Meath (Figure 1). The excavation was

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3158 Cakestown Glebe 2,  County Meath.has no cover

This is a final report of an archaeological excavation at Town Parks 2 which was located on the route of the M3 Navan–Kells & Kells Bypass (Archaeological Services Contract 4) of the M3 Clonee–North of Kells Motorway Scheme, County Meath. The excavation was carried out by Catrion

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3148 Townparks 2,  County Meath.has no cover