+ More options
DRI Logo

Search

Search Results

The N9/N10 Kilcullen to Waterford Road Scheme, of which the Kilcullen to Powerstown Scheme forms part, was proposed as a High Quality Dual Carriageway/Motorway, forming the Major Inter Urban route between Dublin and Waterford. The Kilcullen to Powerstown Scheme was advanced as a

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2581 Busherstown 4,  County Carlow.has no cover

This report presents the final results of archaeological excavations carried out at Ballinorig West 4 in advance of the proposed N22 Tralee Bypass/ Tralee to Bealagrellagh road scheme in Co. Kerry. The proposed scheme has two main components, the N22 Tralee Bypass and the N22 Tra

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E4305 Ballinorig West 4,  County Kerry.has no cover

This is a final report of an archaeological excavation at Town Parks 3 which was located on the route of the M3 Navan–Kells & Kells Bypass (Archaeological Services Contract 4) of the M3 Clonee–North of Kells Motorway Scheme, County Meath. The excavation was carried out by Catrion

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3149 Townparks 3,  County Meath.has no cover