+ More options
DRI Logo

Search

Search Results

This report documents the final results of the archaeological excavation of two Bronze Age roundhouses, a burnt stone spread, a trough, a structure, pits and postholes (site E3327) on the route of the N7 Nenagh to Limerick High Quality Dual Carriageway (HQDC), Carrigatogher (Ryan

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3327 Carrigatogher (Ryan) Site 3,  County Tipperary.cover

This is a final report of an archaeological excavation at Sheephouse 3 (00E0811) which was located on the route of the M1 Northern Motorway Gormanston – Monasterboice (Drogheda Bypass), Platin to Oldbridge, Chainage 21600–24800, Contract 7, County Meath. The excavation was carrie

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report, 00E0811 Sheephouse 3, County Meath.cover

This is a final report of an archaeological excavation at Lagavooren 7 (00E0914) which was located on the route of the M1 Northern Motorway Gormanston – Monasterboice (Drogheda Bypass), Platin to Oldbridge, Chainage 21600–24800, Contract 7, County Meath. The excavation was carrie

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report, 00E0914 Lagavooren 7 , County Meath.cover

The N17/18 Gort to Tuam PPP Scheme is approximately 57 km in length and will connect the N18 Gort to Crusheen Scheme to the existing N17 road immediately north of Tuam. This overall scheme forms part of the Atlantic Corridor designed to connect Letterkenny, County Donegal to Wate

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E4062 Cloondarone A,  County Galway.cover

This report documents the final results of the archaeological excavation of a multi-phase finds-rich site, dating from the Early Neolithic to post medieval or modern periods. The site contained evidencefor Neolithic domestic or ritual activity, Bronze Age domestic or industrial o

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E3370 Cooleen Site 1,  County Tipperary.cover

The N17/18 Gort to Tuam PPP Scheme is approximately 57 km in length and will connect the N18 Gort to Crusheen Scheme to the existing N17 road immediately north of Tuam. This overall scheme forms part of the Atlantic Corridor designed to connect Letterkenny, County Donegal to Wate

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E4065 Cloondarone D,  County Galway.cover

The N17/18 Gort to Tuam PPP Scheme is approximately 57 km in length and will connect the N18 Gort to Crusheen Scheme to the existing N17 road immediately north of Tuam. This overall scheme forms part of the Atlantic Corridor designed to connect Letterkenny, County Donegal to Wate

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E4093 Annagh Hill 2,  County Galway.cover

This report has been prepared by Archer Heritage Planning Ltd for Monaghan County Council. It outlines the final results of Stage (iii) and Stage (iv) archaeological services at Drumgeeny 2 in advance of the N2 Emyvale to Monaghan Road Improvement Scheme, Co. Monaghan. Excavation

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report, 12E208 Drumgeeny 2, County Monaghan.cover