+ More options
DRI Logo

Search

Search Results

This Stage (iv) Excavation Report details the results of the archaeological excavation at Attireesh 2 (ITM 500211, 785480) carried out in advance of the construction of the proposed N5 Westport to Turlough Road Project, which extends between the townlands of Westport Demesne and

N5 Westport to Turlough Road Project | archaeology | dating (measuring)

Object type is text   Text
Object Archaeological excavation report,  E004688 Attireesh 2,  County Mayo.cover

The proposed N8 Rathcormac Fermoy By-Pass is approximately 17.5km in length and will extend from the northern end of the new N8 Glanmire-Watergrasshill Bypass in the townland of Meenane, passing to the west of Rathcormac and to the east of Fermoy and onto the northe

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  03E1461 Lisnagar Demesne 2,  County Cork.cover

The proposed N8 Rathcormac Fermoy By-Pass is approximately 17.5km in length and will extend from the northern end of the new N8 Glanmire-Watergrasshill Bypass in the townland of Meenane, passing to the west of Rathcormac and to the east of Fermoy and onto the northern tie- in poi

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  03E1510 Lisnagar Demesne 1,  County Cork.cover

The proposed N8 Rathcormac Fermoy By-Pass is approximately 17.5km in length and will extend from the northern end of the new N8 Glanmire-Watergrasshill Bypass in the townland of Meenane, passing to the west of Rathcormac and to the east of Fermoy and onto the northe

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  03E1465 Fermoy 1,  County Cork.cover

The proposed M7 Portlaoise to Castletown/M8 Portlaoise to Cullahill Motorway Scheme consists of approximately 41km of motorway and 11km of single dual carriageway commencing to the southwest of the existing Portlaoise Bypass and running in a southern direction tying into the exis

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2170 Parknahown 5  Vol III Osteo Rpt,  County Laois.cover

The proposed M7 Portlaoise to Castletown/M8 Portlaoise to Cullahill Motorway Scheme consists of approximately 41km of motorway and 11km of single dual carriageway commencing to the southwest of the existing Portlaoise Bypass and running in a southern direction tying into the exis

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2170 Parknahown 5  Vol II  Append 1_17,  County Laois.cover

This report details the results of the archaeological excavation at Garrymore 3 in advance of the proposed N55 Realignment Scheme, Co. Cavan (Figures 1-2). The site was identified during Stage (i) archaeological testing of the proposed N55 Road Realignment Scheme, Co. Cavan, by J

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  16E0502 Garrymore 3,  County Cavan.cover

The proposed M7 Portlaoise to Castletown/M8 Portlaoise to Cullahill Motorway Scheme consists of approximately 41km of motorway and 11km of single dual carriageway commencing to the southwest of the existing Portlaoise Bypass and running in a southern direction tying into the exis

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2170 Parknahown 5  Vol IV  Images,  County Laois.cover

This report details the results of the archaeological excavation at Garrymore 2 in advance of the proposed N55 Realignment Scheme, Co. Cavan (Figures 1-2, Plates 1-4). The site was identified during archaeological testing Stage (i) of the proposed N55 Realignment Scheme, Co. Cava

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  16E0521 Garrymore 2,  County Cavan.cover

The proposed M7 Portlaoise to Castletown/M8 Portlaoise to Cullahill Motorway Scheme consists of approximately 41km of motorway and 11km of single dual carriageway commencing to the southwest of the existing Portlaoise Bypass and running in a southern direction tying into the exis

archaeology | dating (measuring) | archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  E2170 Parknahown 5 Vol I Text.,  County Laois.cover

The proposed N8 Rathcormac Fermoy By-Pass is approximately 17.5km in length and will extend from the northern end of the new N8 Glanmire-Watergrasshill Bypass in the townland of Meenane, passing to the west of Rathcormac and to the east of Fermoy and onto the northe

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  03E1459 Lisnagar Demesne 3,  County Cork.cover

The proposed N8 Rathcormac Fermoy By-Pass is approximately 17.5km in length and will extend from the northern end of the new N8 Glanmire-Watergrasshill Bypass in the townland of Meenane, passing to the west of Rathcormac and to the east of Fermoy and onto the norther

archaeology | dating (measuring) | Archaeological excavation report

Object type is text   Text
Object Archaeological excavation report,  03E1457 Rath-Healy 2,  County Cork.cover